top of page
OPTICAL FIBERS
MAVROPIGI AND SOUTHERN FIELD COAL MINES.
Completion period: 2009
Project Owner: PPC
Contractor: ABB
Location: Kozani
Description of works: Installation of fiber optic and control cables.
1/1
1/1
SOUTHWEST FIELD
COAL MINE
Completion period: 2009
Project Owner: PPC
Contractor: ABB
Location: Kozani
Description of works: Installation of fiber optic and control cables.
OTE
Completion period: March 2008
Contractor: OTE
Location: Prefecture of Florina
Description of works: Installation of fiber optic cables between Sklithro and Lechovo in the county of Florina.
1/1
MEGALOPOLIS COAL MINE
Completion period: 2008
Project Owner: PPC
Contractor: ABB
Location: Megalopolis
Description of works: Installation of fiber optic and control cables.
1/1